free case evaluation
Scheduled Construction to Bring Major Slowing
May 13, 2012 | Car Accident
Eager motorists looking to take to Interstate 15 may find themselves in a sea of traffic and frustration as planned closures will take place in a few weeks.
The first closure is scheduled to take place on the southbound lanes from Russell Road to Interstate 215 from 10 p.m. May 22 to 5 a.m. on the 23rd. A second scheduled closure will occur from June 1st to the 5th.
Ramps from Flamingo Road, Tropicana Boulevard, and Russell to I-15 South and Dean Martin Drive will also be shut down.
The Nevada Department of Transportation is enacting these closures in order to remove an old railroad bridge over I-15 South and replacing it with a new one.
Traffic is expected to be detoured from the highway at Russell Road, westbound to Decatur on to the 215 Beltway, which leads back to the southbound I-15. Other detours through the area will be available as well.
This road closure comes as the latest in the transportation department’s i_15 Design-Build South project, designed to improve and expand the number of lanes along the interstate from Tropicana Avenue around Silverado Ranch Boulevard.
If you or someone you know has been in an accident like this, you have the right to compensation. The Law Office of Robert Koenig has the experience needed to win your case. You deserve to have a Las Vegas accident lawyer who will fight for your rights and who can accurately represent your concerns.
You need an accident lawyer who is familiar with all of Nevada’s state laws and will work as hard as possible to serve you and you community. Call the Lawyer’s Group of Nevada today for your free evaluation!
It’s always better to hire the services of a great car accident lawyer to make sure you receive the highest claim possible. We at Car Accident Lawyer Pros will provide you with a talented and caring auto accident lawyer who will ensure that you are aptly compensated.